- December 26, 2023
- Posted by: bbe_2021
- Category: Uncategorized
No Comments
Start Date: 01/2022
End Date: Present
Country: Georgia
Client: LTD Channel Energy (Poti) Limited – Georgia
Within the framework of the project, the laboratory monitors air quality, surface, waste and ground water and soil.
