Paata Germisashvili, Fish Farm – Water Analysis

BBE Laboratory conducted analysis of the water of the fish pond owned by Paata Girmisashvili. As a result of these analyzes, the project of marginal allowable discharge (LDC) of the pond was developed.

Start Date: Apr 2020
End Date: May 2020
Country: Georgia
Client: Paata Germisashvili